Bottom-up estimation
Should cost modelling, Development Guidance, Version 1.0, published by Government Commercial Function in May 2021 states: ‘This takes cost estimates from the lowest (bottom) level and rolls them up to produce an overall expectation of the total cost for the service, project or programme. Here, benchmark costs or historical actuals are used to provide a granular, detailed profile of costs that are then aggregated into a complete cost profile (see IPA’s Best practice in benchmarking for further information on benchmarking). This estimation technique can be time consuming although can provide a higher degree of accuracy than other approaches.’
[edit] Related articles on Designing Buildings
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..